www.konecranes.com › sites › defaultOVERHEAD CRANE TERMINOLOGY – Konecranes AUXILIARY HOIST: Supplemental hoisting unit usually of lower load rating and higher speed than the main hoist. AXLE, FIXED: A shaft which is fixed in the end truck and about which the wheel revolves. AXLE, ROTATING: A shaft which is fixed in the wheel and which rotates on bearings fixed in the end truck. www.overheadcraneconsulting.com › pictionaryPictorial guide to OSHA Crane Terminology — Overhead Crane … "Overhead crane" means a crane with a movable bridge carrying a movable or fixed hoisting mechanism and traveling on an overhead fixed runway structure. OSHA 1910.179(a)(9) "Power-operated crane" means a crane whose mechanism is driven by electric, air, hydraulic, or internal combustion means. OSHA 1910.179(a)(10)
www.hoosiercrane.com › resources › crane-and-hoistHoosier Crane | Crane and Hoist Definitions and Terms Auxiliary Hoist – A supplemental hoisting unit of lighter capacity and usually higher speed than provided for the main hoist. Axial load – The total vertical force applied to the supporting structure in a jib crane. Formula: Axial load= (overall weight of the crane) + (design factor x weight of load) B www.americancrane.com › wp-content › uploadsCrane Terminology – American Crane & Equipment Corporation AUXILIARY HOIST – A supplemental hoisting unit, usually designed to handle lighter loads at a higher speed than the main host. BOGIE – A type of short end truck, used to allow greater distribution of crane wheel loads, by placing multiple wheels at each corner of the crane. www.konecranes.com › auxiliary-handlingAuxiliary handling | Konecranes An auxiliary crane is a crane used in a paper manufacturing plant to support raw material handling and help with maintenance tasks. Basically, it is a spare crane that can replace the main lifting equipment in case of unexpected downtime, or it can assist in repairs or service, minimizing any delays to production. Overhead crane terminology | Konecranes USA”>www.konecranes.com › en-us › discoverOverhead crane terminology | Konecranes USA HOIST, AUXILIARY: A supplemental hoisting unit, usually designed to handle lighter loads at a higher speed than the main hoist. HOIST, MAIN: The primary hoist mechanism provided for lifting and lowering the rated load of the crane. HOIST MOTION: Motion that lifts or lowers a load.
Auxiliary hoist for gantry crane – HOIST magazine”>www.hoistmagazine.com › features › auxiliary-hoistAuxiliary hoist for gantry crane – HOIST magazine
Oct 15, 2009 · Typically, a gantry crane will include a main hoist trolley and an auxiliary hoist trolley on each beam, which are controlled by an hydraulic system. The hydraulic system of the present invention is configured to reduce the hoist capacity (for example, the lifting capacity) of the main hoist trolleys to protect the overhead horizontal beams … Overhead Crane and Hoist Terminology | Crane1″>crane1.com › overhead-crane-and-hoist-terminologyOverhead Crane and Hoist Terminology | Crane1
Dec 5, 2018 · Boom (Overhead Crane): A horizontal member used to permit hoisting as well as lowering the load at a point other than directly under the hoist drum or trolley. The boom is mounted on a trolley. Boom (Gantry Crane): A trolley runway extension often used to obtain clearance for gantry travel by retracting or raising. overhead crane with auxiliary hoist – hoist and crane”>www.whhoist.com › overhead-crane-with-auxiliary-hoistoverhead crane with auxiliary hoist – hoist and crane
Email : [email protected] 24hours hotline : (86) 373 858-8367. Auxiliary Hoist: A supplemental hoisting unit of lighter capacity and usually higher speed than provided for the main hoist. Axial load : The total vertical force applied to the supporting structure in a jib crane.
Cranes Co.,Ltd”>www.fwcranes.com › info › what-are-the-functions-andKnowledge – Henan FineWork Cranes Co.,Ltd
Dec 9, 2021 · 1. For cranes with two hooks, when the main and auxiliary hooks are switched and the heights of the two hooks are similar, they must work separately, one hook and one hook, so as to avoid collision between the two hooks. 2. For cranes with two hooks, two hooks are not allowed to lift two objects at the same time.
Auxiliary handling | Konecranes USA”>www.konecranes.com › auxiliary-handlingAuxiliary handling | Konecranes USA A Konecranes auxiliary crane is a compact, robust and general-purpose lifting machine designed for an industrial operating environment. Depending on your facility, two models are particularly suitable for this purpose. A jib crane with a C-series hoist is an versatile piece of equipment that works well with overhead cranes on production lines … Inspections for overhead cranes and hoists | Konecranes Saudi …”>www.konecranes.com › en-sa › serviceInspections for overhead cranes and hoists | Konecranes Saudi … Inspects non-maintainable load lifting attachments and accessories that are attached to the crane hook during operation. The inspection identifies deficiencies and deviations from local statutory safety and health regulations and is performed by trained and qualified service personnel. The inspection service utilizes radio frequency … Cranes Co.,Ltd”>www.fwcranes.com › info › what-are-the-functions-andKnowledge – Henan FineWork Cranes Co.,Ltd Dec 9, 2021 · 1. For cranes with two hooks, when the main and auxiliary hooks are switched and the heights of the two hooks are similar, they must work separately, one hook and one hook, so as to avoid collision between the two hooks. 2. For cranes with two hooks, two hooks are not allowed to lift two objects at the same time. Auxiliary handling | Konecranes USA”>www.konecranes.com › auxiliary-handlingAuxiliary handling | Konecranes USA A Konecranes auxiliary crane is a compact, robust and general-purpose lifting machine designed for an industrial operating environment. Depending on your facility, two models are particularly suitable for this purpose. A jib crane with a C-series hoist is an versatile piece of equipment that works well with overhead cranes on production lines …
Inspections for overhead cranes and hoists | Konecranes Saudi …”>www.konecranes.com › en-sa › serviceInspections for overhead cranes and hoists | Konecranes Saudi … Inspects non-maintainable load lifting attachments and accessories that are attached to the crane hook during operation. The inspection identifies deficiencies and deviations from local statutory safety and health regulations and is performed by trained and qualified service personnel. The inspection service utilizes radio frequency … Daily inspections essential part of operator routine | Konecranes”>www.konecranes.com › discover › daily-inspectionsDaily inspections essential part of operator routine | Konecranes An employee was assisting a crane operator in the movement of a gang box using an overhead crane. The crane had two hoists—an 80-ton main hoist and a 10-ton auxiliary hoist— and was remote controlled. The main hoist was being used to lower the gang box to a different level. Overhead Crane, China Manufacturer, Factory.”>www.overhead-crane.com › d-overhead-crane-0Overhead Crane, China Manufacturer, Factory. Safety Overhead Suspension Crane. ECH Electric Chain Hoist. VT Electric Wire Rope Hoist. 120+40t Double Girder Overhead Crane. 75/5t Double Girder Overhead Crane. 140/25t Double Girder Overhead Crane. 80/15t Double Girder Overhead Crane. Overhead Crane Products list, China Overhead Crane Manufacturer, Factory offer Overhead Crane with High quality. Crane & Hoist Terminology – American Equipment”>amquipinc.com › crane-hoist-terminologyCrane & Hoist Terminology – American Equipment Below-the-hook accessories. There are a variety of this type of equipment; magnets, c-hooks, sheet lifters, vacuum lifters, tongs, clamps, etc. The capacity of the crane or hoist must include the dead weight of this device as well as the live lifted load when specifying the requirement.
Hoist Lifting – Synchronized Hoists for Long …”>blog.demagcranes.com › en-us › tandem-wire-ropeTandem Wire Rope Hoist Lifting – Synchronized Hoists for Long … Sep 13, 2022 · Lifting with Tandem Wire Rope Hoists. Lifting long, awkward shaped loads overhead may require the use of two wire rope hoists and trolleys. Using two hoists and trolleys makes lifting safer for long, awkwardly shaped products. Dual hoist lifting can be designed with two hoists running on one crane girder, allowing for full load lifting on one …